
Construction Dumpster Rental
Kitchen tear-outs, bathroom remodels, decks, additions and new builds make more debris than a pickup can keep up with. A JB Dumpsters 16-yard dumpster takes it for $365 with 1 ton and 7 days included, delivered within 20 miles of Lynn. Call or text (828) 691-0375.
Remodeling debris piles up fast: drywall, old cabinets, flooring, framing offcuts, packaging and the odd vanity or tub. Left in the yard, it turns into a trip hazard and an eyesore for the neighbors. A dumpster beside the work keeps the site clean and saves the runs to the transfer station. Polk County charges all construction waste by the ton, and Henderson County weighs every construction load at the scale, so even a pickup run means a stop at the scale house.
We rent to homeowners doing their own remodel and to builders, remodelers and trade crews working around Tryon, Columbus, Landrum, Flat Rock and Hendersonville. The price is the same for both: $365 for the dumpster, 1 ton of debris and up to 7 days. Extra days are $8, and weight over the first ton is $77 per ton in Polk County and $72 per ton in Henderson County. Details are on our prices page.
Construction debris weighs more than household junk but less than shingles or concrete, so plan on some extra weight once the box is full. Our 16-yard dumpster is the only size we rent. It suits a kitchen, a bath or two, a deck tear-off, or the framing and drywall waste from a small addition. Bigger builds may need more than one load over the course of the job.
Construction & Remodel, Step by Step

Remodels and tear-outs
A kitchen or bath remodel is the classic dumpster job. Cabinets, countertops, drywall, flooring and fixtures come out in a day or two, and then the box takes the offcuts and packaging while the new work goes in. Order the dumpster for the morning demolition starts and plan on the full week. If the tear-out runs longer than expected, extra days are $8 each, so a ten-day job adds $24. Tile, plaster and stone counters are heavy, so mention them when you book.
New builds and additions
On new construction, the dumpster stays through framing, roofing and drywall, when waste is steady and mostly lumber, sheathing, packaging and drywall scraps. Those materials are bulky but not dense: clean lumber is only about 169 pounds per cubic yard by EPA figures. One 16-yard box covers a good share of a small addition or a garage build. On a whole house, plan for more than one load across the build and talk to us about timing as each stage wraps up.
For contractors
We serve residential and commercial customers, including builders, remodelers and trade crews. Book with the job address, the start date, a site contact and where the dumpster should go, and we deliver it on a trailer behind a pickup. Pricing is the same on every job, so you can put the $365 base, the $8 extra day and the per-ton rate straight into a bid. If the job site is past 20 miles from our yard, we give you the mileage charge before you book. Call or text (828) 691-0375.
Keep the load clean
Mixed construction debris is what the dumpster is for, but a few things cannot go in: paint and solvents, chemicals, tires, batteries, asbestos, and fuel or propane tanks. Concrete, brick and dirt go in only if we approve them first, because a couple of cubic yards weigh as much as the whole included ton; see our dirt and concrete page. Before tearing into an older building, check for asbestos. North Carolina's health department calls for an accredited asbestos inspection before demolition or renovation, with some exceptions for homeowners.
What a remodel load weighs
The EPA puts mixed construction and demolition debris at about 417 to 484 pounds per cubic yard and drywall at 467. That means roughly 4 to 5 cubic yards of remodel debris make a ton, about a quarter of our 16-yard box. A full box of mixed debris is likely to weigh 3 to 4 tons, so expect 2 or 3 extra tons: $154 to $231 in Polk County or $144 to $216 in Henderson County. Lumber-heavy loads weigh less.
What a Construction & Remodel Dumpster Costs
Same dumpster, same price list. See every number and worked examples.
$365
- 1 ton of waste included
- Up to 7 days on site
- Delivery included within 20 miles
Towns We Deliver to Most
Delivery is included within 20 miles. All towns and delivery fees.
Construction Dumpsters by town
Construction & Remodel Questions
Not seeing yours? Call or text (828) 691-0375, or read the full FAQ.
Is a 16-yard dumpster big enough for a kitchen remodel?
For most kitchens, yes. Cabinets, countertops, drywall, flooring and packaging from a typical kitchen fit in one 16-yard box. Stone counters and tile are heavy, so tell us about them when you book and we will help you estimate the weight before delivery.
Do you rent to contractors?
Yes. We serve residential and commercial customers, including builders, remodelers and trade crews. The price is the same on every job: $365 with 1 ton and 7 days, $8 per extra day and per-ton rates by county. Call or text (828) 691-0375 to set up a delivery.
Can I put drywall in the dumpster?
Yes. Drywall scraps and torn-out walls are standard construction debris. The EPA puts drywall at 467 pounds per cubic yard, so a little over 4 cubic yards makes a ton. Keep paint cans, solvents and adhesives out of the load.
Can concrete or brick go in with remodel debris?
Only if we approve it first, so call before loading any. Concrete weighs about 860 pounds per cubic yard, which means a small pile can use up the whole included ton. Our dirt and concrete page explains how heavy loads work.
How long can a dumpster stay on a job site?
Up to 7 days come with the $365 price. After that it is $8 per day, so a three-week job adds $112 for days 8 through 21. Tell us the expected length when you book so the pickup is planned around your schedule.
The Same Dumpster Also Handles
01Cleanouts
Houses, garages, basements, estates and rentals, loaded at your own pace for a week.
See cleanouts
02Roofing
Shingles, felt and flashing from a tear-off, with the weight worked out before delivery.
See roofing
03Yard Waste & Storm Debris
Brush, limbs, leaves and storm debris: bulky, light and a good fit for one box.
See yard waste & storm debrisConstruction Dumpsters by Town
The same job in more towns we deliver to.
Need a Dumpster for Construction & Remodel?
$365 for the 16-yard dumpster with 1 ton and up to 7 days included. Tell us the address and the day you want it.
