
Dirt & Concrete Dumpster Rental
Dirt, concrete, brick and rock can go in our 16-yard dumpster only if we approve the load first. They are so heavy that 2 to 3 cubic yards already weigh the included ton. Call or text (828) 691-0375 before you load, and we will tell you what works.
Dirt and concrete are the heaviest things people want to throw away. The EPA puts dirt and sand at 929 pounds per cubic yard and broken concrete at 860. A small patio, a few feet of footing or the soil from a dug-out bed turns into tons very quickly. That is why heavy material is the one category on our list that needs approval: concrete, dirt and bricks go in only if we approve the load before it is loaded.
When you call, tell us what the material is, roughly how much there is and whether it is clean or mixed with other debris. We will tell you whether our 16-yard dumpster can take it and how full to load it. Clean loads of one material are easier to place at the disposal site. Polk County takes concrete, block, brick and asphalt as a separate stream, and Henderson County charges less for clean concrete than for mixed waste.
The base price is the same as any rental: $365 with 1 ton and up to 7 days. Weight over the first ton is $77 per ton in Polk County and $72 per ton in Henderson County. In South Carolina and other areas it is billed per ton at that area's disposal rate, which we tell you when you book. With heavy material, weight sets the cost, so we work out a likely total with you first. All rates are on our prices page.
Dirt & Concrete, Step by Step

Why we ask first
Dirt and concrete get heavy long before the box looks full. By EPA figures, a 16-yard dumpster filled to the top with soil would weigh around 7 tons, far more than a normal load. Weight also drives your bill, and an unplanned heavy load is the most common way a $365 rental turns into a surprise. Calling first gets you a straight answer on how much of the box to fill, how to load it and roughly what it will cost, before anything goes in.
Dirt
Fill dirt from a small dig, an old garden bed or a leveling job is the most common heavy request. At 929 pounds per cubic yard, a ton of dirt is only about 2.2 cubic yards, a little less than one level 8-foot pickup bed. Keep the dirt free of trash, roots and construction debris if you can. Tell us how much you expect to remove and whether it is wet, since soaked soil weighs more than dry. We will tell you how much of the box to fill.
Concrete, brick and block
Broken concrete runs about 860 pounds per cubic yard, so a ton is about 2.3 cubic yards of pieces. A small patio or a short walkway can weigh several tons once it is broken up. Brick and block are heavy too. Break pieces small enough to lie flat, and spread them evenly across the floor of the dumpster rather than piling them at one end. If you also need the concrete broken out, see our demolition services for slab, driveway and patio removal.
Mixed heavy loads
Most renovation jobs make some heavy waste mixed in with lighter debris: a few buckets of tile, some broken block, a little dirt from a footing. Even small amounts of concrete, brick or dirt need a call first, and they all count toward the weight, so mention them when you book and the estimate will be right. If there is more than a little heavy material, keep it in its own pile until we talk. That way the load can be planned properly and you know the cost before it goes in.
What 1 ton of heavy material looks like
By the EPA's figures, dirt and sand weigh 929 pounds per cubic yard and concrete 860, so the included ton is about 2.2 cubic yards of dirt or 2.3 cubic yards of concrete. That is roughly a seventh of our 16-yard box. Every ton after that is $77 in Polk County or $72 in Henderson County. A 4-ton load of broken concrete in Polk County would come to $365 plus 3 tons at $77, or $596 in all, before any extra days.
What a Dirt & Concrete Dumpster Costs
Same dumpster, same price list. See every number and worked examples.
$365
- 1 ton of waste included
- Up to 7 days on site
- Delivery included within 20 miles
Towns We Deliver to Most
Delivery is included within 20 miles. All towns and delivery fees.
Dirt & Concrete Questions
Not seeing yours? Call or text (828) 691-0375, or read the full FAQ.
Can you put dirt in a dumpster?
In our dumpster, only if we approve it first. Dirt weighs about 929 pounds per cubic yard, so a little over 2 cubic yards uses up the included ton. Call or text (828) 691-0375 with how much you have, and we will tell you whether it works and how full to load the box.
Can I put concrete in the dumpster?
Yes, if we approve it before you load it. Broken concrete weighs about 860 pounds per cubic yard, and a broken-up patio can run several tons. Tell us the size of the slab or the pile, and we will help you work out the weight and the price.
How much does a dumpster for dirt cost?
The base price is $365 with 1 ton and 7 days. Each extra ton is $77 in Polk County and $72 in Henderson County; other areas are billed at that area's disposal rate, which we tell you when you book. A 3-ton load of dirt in Polk County comes to $519.
Can I mix dirt or concrete with other debris?
Small amounts mixed into a remodel load are common, but they still need a call first and they count toward the weight. Clean loads of one material are easier to place at the disposal site. Henderson County, for example, charges less per ton for clean concrete and masonry than for mixed waste.
Why do you need to approve heavy loads?
Because they get heavy long before the box looks full. A 16-yard dumpster filled to the top with soil would weigh about 7 tons by EPA figures. Approving the load first lets us tell you how much to put in, keep the haul safe and give you a realistic price before anything is loaded.
The Same Dumpster Also Handles
01Cleanouts
Houses, garages, basements, estates and rentals, loaded at your own pace for a week.
See cleanouts
02Roofing
Shingles, felt and flashing from a tear-off, with the weight worked out before delivery.
See roofing
03Construction & Remodel
Kitchens, baths, decks, additions and new builds, at one price for crews and homeowners.
See construction & remodelNeed a Dumpster for Dirt & Concrete?
$365 for the 16-yard dumpster with 1 ton and up to 7 days included. Tell us the address and the day you want it.
